  • Installation of a transformer with a capacity of 75/125 MVA at a voltage of 330/33kV on the “Prokat” substation

Installation of a transformer with a capacity of 75/125 MVA at a voltage of 330/33kV on the “Prokat” substation

VIEW LIST

  Within the framework of the project, the following was carried out:

  • installation of a 75/125 MVA transformer with a voltage of 330/33 kV with an oil receiver device;
  • installation of a high-voltage gas switch, disconnector and earthing device, OPN, TT and TN;
  • device of bus supports with a clamp for 330 kV wires;
  • device of bus supports with a clamp for 110 kV wire;
  • device of phase-shielded current line with cast insulation 33 kV;
  • connection of the transformer to GRU-33kV the second section of tires of PS “Prokat”;
  • in GRU-33kV PS “Prokat” an additional 33kV section was performed;
  • FKU 33kV device;
  • RZiA devices;
  • the device of the fire extinguishing and oil disposal system;
  • laying of control and power cables.